Ghana launches emergency cleanup to clear one million tonnes of Agbogbloshie waste.

The Agbogbloshie commissioning ceremony was held at the IRECOP Management Centre in Jamestown, Accra, at 10 a.m. on September 18, 2026.
The Agbogbloshie operation was organized by the Ministry of Local Government, Decentralisation and Rural Development in collaboration with the Ghana Armed Forces, with support from the District Road Improvement Programme.
Before the Jamestown evacuation began, Local Government Minister Mahama Ayariga inspected the site to assess the waste buildup and determine the trucks and heavy-duty equipment needed for the work.
Officials said clearing the Jamestown waste heap is intended to improve sanitation around both Jamestown and the polluted Korle Lagoon, where the accumulation has persisted for several decades.
Ghana has launched an emergency cleanup of its most notorious landfill, Agbogbloshie in Accra, targeting removal of roughly one million tonnes of waste in just 90 days. President Mahama commissioned the operation on September 18, 2026, mobilizing the Ghana Armed Forces and heavy equipment to haul decades of accumulated rubbish 42 kilometers to the Adepa Waste Centre in Nsawam. The effort marks the start of a broader national waste crisis response affecting major dumpsites across the country.
Beyond cleanup, officials say reclaimed land will spark economic revival. Agbogbloshie is slated for redevelopment into an industrial park, with a textile factory planned to create jobs for young Ghanaians. The parallel Jamestown evacuation targets decades-old waste choking the Korle Lagoon, a longtime environmental disaster that has damaged public health and fishing livelihoods across Accra's waterfront communities.
The Agbogbloshie operation is Ghana's most aggressive single waste removal effort to date. Ghana News Agency reported that trucks and heavy machinery began hauling refuse from the sprawling Accra dump to Adepa, an engineered landfill facility built to handle hazardous and general waste safely. The 42-kilometer transport route connects central Accra to the Eastern Region site, with 3 News confirming the one-million-tonne target and 90-day timeline.
Local Government Minister Mahama Ayariga personally inspected Jamestown before that evacuation began, assessing equipment needs and waste volume. Officials flagged the site's dire condition—decades of buildup next to the Korle Lagoon has contaminated fish stocks and poisoned groundwater. Clearing both sites is expected to restore usable land and improve public health in two of Accra's poorest neighborhoods.
President Mahama announced an ambitious redevelopment plan for cleared landfill sites. Agbogbloshie will become an industrial park, with a textile factory as the flagship project. The factory is designed to employ young Ghanaians in manufacturing jobs, reversing decades of environmental neglect and creating stable income streams in a region historically dependent on informal waste trading.
The vision extends nationwide. Mahama pledged to build engineered landfill facilities in all 16 regional capitals, signaling a shift from open dumping to managed waste infrastructure. These engineered sites will replace ad-hoc landfills that have poisoned water supplies and spread disease across Ghana's cities for years.
The Ghana Armed Forces are spearheading the evacuation, working alongside the Ministry of Local Government and the District Road Improvement Programme. GBC Ghana noted this military-led approach allows the government to deploy heavy equipment and personnel on an unprecedented scale. Trucks run continuously to meet the 90-day deadline, with logistics coordinated from the IRECOP Management Centre in Jamestown where President Mahama held the commissioning ceremony on September 18.
Publishers
15
Articles
4
Reach
19